Water, Wastewater, and Reclaimed Water Technical Specifications
 
DIVISION 2 - SITE WORK
Cover ( PDF, 398KB )


    SECTION 02070 - Boring and Jacking ( PDF, 27KB )

  1. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Related Work

  2. PART 2 - PRODUCT

      2.1 --- Pipe Casing
      2.2 --- Joints
      2.3 --- Carrier Pipe

  3. PART 3 - EXECUTION

      3.1 --- General
      3.2 --- Excavation
      3.3 --- Boring & Jacking
      3.4 --- Grouting
      3.5 --- Loss of Ground
      3.6 --- Tolerances
      3.7 --- Responsibility
      3.8 --- Installation of Pipe
      3.9 --- Insurance Requirements and Fees
      3.10 -- Successful Completion


  4. SECTION 02072 - Horizontal Directional Drill ( PDF, 36KB )

  5. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Related Work

  6. PART 2 - PRODUCTS

      2.1 --- Polyvinyl Chloride Pipe and Fittings

  7. PART 3 - EXECUTION/INSTALLATION
      3.1 --- Description

  8. SECTION 02080.1 - Water Mains and Appurtenances ( PDF, 153KB )

  9. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawings and Submittals
      1.4 --- Related Work

  10. PART 2 - DESIGN

      2.1 --- Line Sizing Criteria
      2.2 --- Minimum Line Size
      2.3 --- Line Routing
      2.4 --- Depth of Cover
      2.5 --- Protection of Potable Water Systems
      2.6 --- Cross-Connection Control
      2.7 --- Metering Assemblies
      2.8 --- Service Connections
      2.9 --- Meters
      2.10 -- Fire Hydrant Spacing, Location & Flow
      2.11 -- Valve Location
      2.12 -- Pipe, Fittings, & Appurtenances
      2.13 -- Subaqueous Service Pipe & Aerial Crossing Pipe
      2.14 -- Blow-Off Assembly

  11. PART 3 - PRODUCTS

      3.1 --- Pipe Material
      3.2 --- Ductile Iron Pipe & Fittings
      3.3 --- Polyvinyl Chloride Pipe & Fittings
      3.4 --- Gaskets
      3.5 --- Polyethylene (PE) Extrusions
      3.6 --- Corporation Stops
      3.7 --- Curb Stops
      3.8 --- Dual Service Wyes
      3.9 --- Meter Boxes
      3.10 -- Valves
      3.11 -- Fire Hydrants
      3.12 -- Backflow Prevention Assemblies

  12. PART 4 - CONSTRUCTION
    • 4.1 --- Work at Highway or Railroad Crossings
      4.2 --- Preconstruction Pipe Inspection/Certification
      4.3 --- Installation
      4.4 --- Trench Excavation
      4.5 --- Handling & Cutting Pipe
      4.6 --- Pipe Laying
      4.7 --- Installing Joints
      4.8 --- Installing Appurtenances
      4.9 --- Water Service Connections
      4.10 -- Polyethylene (PE) Tube Encasement
      4.11 -- Backfill/Compaction
      4.12 -- Temporary Water Service for Construction
      4.13 -- Flushing & Cleaning
      4.14 -- Hydrostatic & Leakage Testing
      4.15 -- Disinfecting Water Systems
      4.16 -- Connection to Existing Water Mains

  13. PART 5 - PRESSURE TESTING FORMS
  14. SECTION 02080.2 - WATER EXHIBITS ( PDF, 2350KB )

    SECTION 02081.1 - Gravity Wastewater Sewers & Appurtenances ( PDF, 120KB )

  15. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawings and Submittals
      1.4 --- Related Work

  16. PART 2 - DESIGN

      2.1 --- Flow Criteria
      2.2 --- Minimum Line Size
      2.3 --- Alignment
      2.4 --- Depth of Cover
      2.5 --- Slope
      2.6 --- Horizontal Separation
      2.7 --- Crossings
      2.8 --- Gravity Laterals
      2.9 --- Wastewater Manholes
      2.10 -- Manhole Frames and Covers
      2.11 -- Connections to Gravity Systems
      2.12 -- Waterproof and Protective Coatings

  17. PART 3 - PRODUCTS

      3.1 --- Material
      3.2 --- PVC Pipe and Fittings
      3.3 --- Manholes
      3.4 --- Manhole Frames and Covers
      3.5 --- Mortar For Pipe and Manhole Riser
      3.6 --- Brick
      3.7 --- Waterproof and Protective Coatings

  18. PART 4 - CONSTRUCTION
    • 4.1 --- Work at Highway or Railroad Crossings
      4.2 --- Preconstruction Pipe Inspection/Certification
      4.3 --- Installation
      4.4 --- Trench Excavation
      4.5 --- Handling and Cutting Pipe
      4.6 --- Pipe Laying
      4.7 --- Installing Joints
      4.8 --- Installing Manholes
      4.9 --- Gravity Laterals
      4.10 -- Sleeves
      4.11 -- Backfill/Compaction
      4.12 -- Connections to Gravity Systems
      4.13 -- Taking Existing Wastewater Systems out of Service
      4.14 -- Inspection and Testing
  19. PART 5 – WASTEWATER PEAKING FACTOR
  20. PART 6 – TELEVISING OF LINES

  21. SECTION 02081.2 - Wastewater Force Mains and Appurtenances ( PDF, 105KB )

  22. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawings and Submittals
      1.4 --- Related Work

  23. PART 2 - DESIGN

      2.1 --- Flow Criteria
      2.2 --- Minimum Line Size
      2.3 --- Depth of Cover
      2.4 --- Horizontal Separation
      2.5 --- Crossings
      2.6 --- Pipe, Fittings, and Appurtenances
      2.7 --- Valves
      2.8 --- Connections to County Systems

  24. PART 3 - PRODUCT

      3.1 --- Material
      3.2 --- Polyvinyl Chloride Pipe and Fittings
      3.3 --- Ductile Iron Pipe and Fittings
      3.4 --- Gaskets
      3.5 --- Valves and Appurtenances

  25. PART 4 - CONSTRUCTION

      4.1 --- Work at Highway or Railroad Crossings
      4.2 --- Preconstruction Pipe Inspection/Certification
      4.3 --- Installation
      4.4 --- Trench Excavation
      4.5 --- Handling and Cutting Pipe
      4.6 --- Pipe Laying
      4.7 --- Installing Joints
      4.8 --- Installing Appurtenances
      4.9 --- Backfill/Compaction
      4.10 -- Flushing and Cleaning
      4.11 -- Hydrostatic and Leakage Test
      4.12 -- Connections to Existing System

  26. PART 5 - WASTEWATER PEAKING FACTORS
  27. PART 6 - PRESSURE TESTING FORMS


  28. SECTION 02081.3 - Wastewater Pumping Station ( PDF, 293KB )

  29. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawings and Submittals
      1.4 --- Tools and Spare Parts
      1.5 --- As-Built/Record Drawings
      1.6 --- Related Work

  30. PART 2 - DESIGN AND CONTRUCTION STANDARDS

      2.1 --- Siting Requirements
      2.2 --- Horizontal Separation
      2.3 --- Crossing
      2.4 --- Flow
      2.5 --- Total Dynamic Head (TDH)
      2.6 --- System Head versus Pump Capacity Analysis
      2.7 --- Electrical Classification
      2.8 --- Pumps
      2.9 --- Wet Wells
      2.10 – Piping Design
      2.11 – Station Access

  31. PART 3 - PRODUCT

      3.1 --- Wet Well
      3.2 --- Discharge Piping and Appurtenances
      3.3 --- Wastewater Pumps
      3.4 --- Potable Water Faucets
      3.5 --- Pumping Station Controls
      3.6 --- Remote Telemetry and Appurtenances
      3.7 --- Conduit Systems
      3.8 --- Wiring Systems
      3.9 --- Pressure Taps and Pressure Measuring Systems
      3.10 – Level Measuring System
      3.11 – Level Detection Switches

  32. PART 4 - CONSTRUCTION

      4.1 --- Site Work
      4.2 --- Wet Well
      4.3 --- Equipment
      4.4 --- Electrical
      4.5 --- Installation – Remote Telemetry Units and Appurtenances
      4.6 --- Site Paving and Fencing
      4.7 --- Final Inspection and Testing

  33. PART 5 – WASTEWATER PEAKING FACTORS
  34. PART 6 – WASTEWATER PUMPING STATION CONSTRUCTION START-UP PROCEDURE
  35. SECTION 02081.5 - Pump Station Control and SCADA Requirements ( PDF, 46KB )

    SECTION 02081.6 - Wastewater Exhibits ( PDF, 1573KB )

    SECTION 02083.1 - Reclaimed Water Mains and Appurtenances ( PDF, 200KB )

  36. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawing Submittals
      1.4 --- Related Work

  37. PART 2 - DESIGN

      2.1 --- General
      2.2 --- Line Sizing Criteria
      2.3 --- Depth of Cover
      2.4 --- Separation of Reclaimed Water, Potable Water, and Sewer Lines
      2.5 --- Cross-Connection Control
      2.6 --- Golf Courses and Other Major Uses
      2.7 --- Meters and Other Metering Assemblies
      2.8 --- Service Connections
      2.9 --- Valves and Valve Locations
      2.10 – Pipe, Fittings, and Appurtenances
      2.11 – System Identification and Signage
      2.12 – Subaqueous Service Pipe and Aerial Crossing Pipe
      2.13 – Hose Bibb Assembly
      2.14 – Blow-off assembly

  38. PART 3 - PRODUCT

      3.1 --- Pipe Material
      3.2 --- Ductile Iron Pipe and Fittings
      3.3 --- Polyvinyl Pipe and Fittings
      3.4 --- Gaskets
      3.5 --- Polyethylene (PE) Extrusion
      3.6 --- Corporation Stops
      3.7 --- Curb Stops
      3.8 --- Dual Service Wyes
      3.9 --- Valves
      3.10 – Meter Specifications
      3.11 – Backflow Prevention Assemblies
      3.12 – Hose Bibb Assembly

  39. PART 4 - CONSTRUCTION

      4.1 --- Work at Highway and Railroad Crossings
      4.2 --- Preconstruction Pipe Inspection/Certification
      4.3 --- Installation
      4.4 --- Trench Excavation
      4.5 --- Handling and Cutting Pipe
      4.6 --- Pipe Laying
      4.7 --- Installing Joints
      4.8 --- Installing Appurtenances
      4.9 --- Golf Courses and Other Major Uses.
      4.10 – Service Connections
      4.11 – Hose Bibb Connection Assembly
      4.12 – Installing Back-Flow Prevention Devices
      4.13 – Polyethylene Tube Encasement
      4.14 – Backfill/Compaction
      4.15 – Temporary Potable Water Service for Construction
      4.16 – Flushing and Cleaning
      4.17 – Hydrostatic and Leakage Test
      4.18 – Connection to Existing Reclaimed Water Mains

  40. PART 5 - PIPE SIZING CRITERIA

      5.1 --- Design Standard for Reclaimed Water Distribution Systems
      5.2 --- Residential Subdivisions
      5.3 --- Commercial Developments

  41. PART 6 – PRESSURE TESTING FORMS

    SECTION 02083.2 - Reclaimed Water Exhibits ( PDF, 2019KB )

 

 

    DIVISION 3 - CONCRETE

    SECTION 03010 - Concrete Reinforcement ( PDF, 48KB )

  1. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Quality Assurance
      1.4 --- Shop Drawings and Submittals
      1.5 --- Related Work
      1.6 --- Product Delivery, Storage and Handling

  2. PART 2 - PRODUCT

      2.1 --- General
      2.2 --- Material

  3. PART 3 - EXECUTION

      3.1 -- Cutting and Bending - Reinforcement
      3.2 --- Bar Supports and Spacers
      3.3 --- Steel Reinforcement
      3.4 --- Splicing
      3.5 --- Concrete Protection for Reinforcement
      3.6 --- Field Quality Control

    SECTION 03020 - Cast-In-Place Concrete ( PDF, 108KB )

  4. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Quality Assurance
      1.4 --- Submittals
      1.5 --- Related Work
      1.6 --- Product Delivery, Storage and Handling

  5. PART 2 - PRODUCT

      2.1 --- Materials

  6. PART 3 - EXECUTION

      3.1 --- Field Quality Control
      3.2 --- Material Preparation
      3.3 --- Conveying
      3.4 --- Preparation for Placement
      3.5 --- Placement
      3.6 --- Curing and Protecting
      3.7 --- Weather Protection
      3.8 --- Defective Concrete
      3.9 --- Damaged Work
      3.10 -- Tolerance for Concrete Construction

    SECTION 03030 - Forms and Formwork ( PDF, 28KB )

  7. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Related Work
      1.4 --- Quality Assurance
      1.5 --- Submittals
      1.6 --- Product Delivery, Storage and Handling

  8. PART 2 - PRODUCT

      2.1 --- Forms and Accessories

  9. PART 3 - EXECUTION

      3.1 --- Fabrication
      3.2 --- Preparation
      3.3 --- Installation, Removal & Reshoring
      3.4 --- Embedded Items
      3.5 --- Field Quality Control
      3.6 --- Joints
      3.7 --- Removal of Forms, Falsework & Centering

  10. APPENDICES


Hillsborough County is an Equal Opportunity/Affirmative Action Employer

For Spanish speakers, please review the Spanish Translation Disclaimer before using the translation service.
For all other language speakers, please review the Standard Translation Disclaimer, which will translate to the language the user selects.

Hillsborough County Seal
Copyright 2008 | HIPAA Information | Legal Information | Translation Notice